Funding a small group of Forestville people back in 2013 with a Matching Grant to purchase four acres of undeveloped land was a risk.  There were members of our community that worried this project would be the ruin of the town turning it into a homeless encampment, a drug center, a blight. The FPA Board believed in its potential and the Ag and Open Space funding committee saw it too, thus “Forever Forestville” was funded, the land purchased, and the rest is history.  Our history, but yours as well.  Your matching grant is an example of a successful partnership between your agency and a grateful community.

Because you placed your faith in us, the FPA Board takes our responsibility for this land seriously. Here are some of the activities that have taken place since then.

Improvements along the way:

  • Oaks management including mulching and tree trimming
  • Purchased appropriate signage for park management
  • Purchased redwood picnic tables (Probation Camp quality)
  • Removed an acre of blackberry bushes
  • Continue to use abatement procedures for blackberries
  • Hosted a “Workday” for invasive species removal (done annually)
  • Purchased stainless steel “bear cans” for trash management
  • Took out dirt road through the middle of the park left over from installation of the wood bridge and replanted with native grasses
  • The wood bridge itself linking the West County Trail to town
  • Installed two “dog poop” stations
  • Removed invasive species near the bridge
  • Planted in a native species garden near the bridge
  • Graded and improved gravel road along east of property
  • Upkeep of the parking lot after yearly rains
  • Mow grasses outside of wetlands regularly then mow dried grasses in the fall for fire protection

Improvements to be complete within this next year:

  • Water station installation (from Zero Waste)
  • Install bike rack (from County grant)
  • Build a “stacked stone wall” in October through donations
  • Design a “Forestville Downtown Oaks Park” metal sign to be installed
  • Update the informational sign to recognize donors
  • Have a sidewalk installed along the northern boundary (116) through a pending County project
  • Remove an oak tree that extends over the parking lot in a dangerous fashion
  • Put in a “Fire Safe” demonstration garden partnering with the Fire Department
  • Put in a pollinator garden partnering with the Atascadero/Green Valley Creek Watershed Council

Improvements in the works for the future:

  • Extend the parking lot up to Mirabel Road through cooperation with the County, Forestville Water District and owners of that piece of property
  • Partner with the Water District to install a “sweet smelling” tank style toilet recommended by the Forest Service. The upper lot has the sunshine needed for the solar fan to work
  • Move the bus station further west along 116, a county project along with the sidewalks
  • Install a second bike rack closer to the southeast corner of the property
  • Improve the parking lot (see drawings)
  • Build a stage, getting electricity to that area
  • Improve the path to the stage as an official secondary trail
  • Continue to replace invasive species with native species

Challenges:

  • Expenses including maintenance and insurance cost $15,600 a year, more than our annual income
  • Most of the funding we get from quarry mitigation go into a Community Fund to be funneled back into the community with about $5,000 towards ongoing park expenses such as purchases, repairs and improvements
  • Fundraising through our own event, Pie in the Park nets just $7,000
  • The Use Permit cost over $120,000 from Permit fees, consultant fees, multiple studies and the like which took all our built-up reserves
  • Keeping folks living in RVs from overnight parking
  • Keeping homeless folks from living in the bushes at the neighbor’s property
  • Getting and keeping quality Board members
  • Always keeping the park litter free
  • Recruiting volunteer help to care for the park, to get involved hands on

How this land is currently used

Forestville Downtown Oaks Park hosts:

  • Farmers Markets June through September
  • Forestville’s Holiday Tree
  • A yearly “Skate Spot” Fun Run
  • A Forestville School bike-a-thon
  • Mardi Gras celebration
  • Pie in the Park fundraiser for the Oaks Park
  • Nonprofit gatherings
  • Parking for trail users
  • Overflow parking for the town
  • Picnic tables encourage people to pause for a while to enjoy a cup of coffee, pastry or sandwich from the bakery
  • It’s the gateway to the West County Trail

Hundreds of people make use of this trail weekly whether it’s walking their dog, pushing a stroller, teaching their kids to ride a bike, biking themselves (it’s an official Class 2 bike lane) or taking a stroll for their health. It was certainly a godsend during Covid.  The town has had an uptick in business as folks from the trail stop in for an ice cream cone, grab a loaf of bread from the bakery or stay longer to enjoy a pizza.

As you see, this park has become a central hub for our community.  It’s importance to the town is undeniable.  It has helped us grow.  It has helped us connect.  It has helped identify who we are as a town, what we value and how we show we care.

Thank you, Ag and Open Space, for believing in our tiny community and trusting us to care for this special space.  We appreciate you!

Lucy Hardcastle, President of the FPA on behalf of our Board members Joanie Blechel, Kristie Cannady, Alicia Chazen, Wayne Gibb, Stephnie Kiriakopoulos, Vikki Miller, Ken Smith

Monthly
Board Meetings

• 1st Tuesday of mo.
• 5:30 – 7:30 PM
• In-Person at:
6550 Railroad Ave., Forestville
• Via Zoom: Get Link
• For more info, contact:
Board President,
Lucy Hardcastle
Everyone welcome.